Global data center power capacity surged by nearly 66% in the third quarter of 2026, yet available vacancy rates dropped by half. A report from DatacenterHawk indicates that 18 GW of power was leased during this period, driven by high demand in North America and the APAC region. While 9.2 GW of capacity remains under construction, current supply is being absorbed almost as quickly as it is built.
Global data center capacity tightens as demand outpaces new construction
Reviewed by the Dhallo deskSource: TechRadar

Original reporting
TechRadar · techradar.com
Summary written by Dhallo News with AI assistance from TechRadar's reporting. Read the original for the full story.
Spotted an error in this story?





