The panel recently conducted a field inspection of the main dam, baby dam, earthen dam and spillway, besides hearing the submissions of both Keralam and Tamil Nadu
Keralam Seeks Mullaperiyar Safety Review as per 2025 Terms of Reference
The panel recently conducted a field inspection of the main dam, baby dam, earthen dam and spillway, besides hearing the submissions of both Keralam a...
By Dhallo News · September 3, 2026 at 12:02 PM IST
SOURCE: Deccan Chronicle Politics
ORIGINAL REPORT: Click here
DHALLO EDITORIAL STATUS: Aggregated & reviewed
Have feedback on this article?Report error or suggestion
