Local residents are urging authorities to expedite the construction of a 43-km four-lane greenfield highway connecting Kumbakonam and Sirkazhi. The project, which was proposed several years ago under the Bharatmala Pariyojana inter-corridor plan, aims to improve connectivity between SH-64 and NH-136B. The demand follows long-standing delays in the implementation of this infrastructure development initiative.
Residents demand progress on Kumbakonam-Sirkazhi greenfield highway project
Reviewed by the Dhallo deskSource: The Hindu - National

Background The project was originally proposed as part of the Bharatmala Pariyojana inter-corridor plan.
Original reporting
The Hindu - National · thehindu.com
Summarised by Dhallo News from The Hindu - National's report, with its facts and figures checked against the original. Read the original for the full story.
Spotted an error in this story?



