The Navi Mumbai Municipal Corporation has announced a 12-hour water supply suspension across various nodes, including Belapur and Vashi, on November 27. This disruption is necessary to facilitate the installation of new flow meters and valves on the main pipeline stretching from Belapur to Airoli. Residents are advised to store sufficient water in advance to manage their needs during the scheduled maintenance period on that day.
Navi Mumbai to face 12-hour water supply suspension on November 27
Reviewed by the Dhallo deskSource: Free Press Journal - General

Original reporting
Free Press Journal - General · freepressjournal.in
Summary written by Dhallo News with AI assistance from Free Press Journal - General's reporting. Read the original for the full story.
Spotted an error in this story?



